CTEC lift terminals – 2002



More Information

CTEC lift terminals
1968 Hall lift converted to CTEC drive terminal, currently a double chair, but design to handle bullwheel for triple or quad lift.
Eclipe top terminal
Chairs and grips CTEC
740 Vertical 2700 length, 125 HP AC VFD Parker SSD drive, Hydraulic tension, lots of Hall sheave trains and wheels, CTEC built lifting frames and cat walks for 13 towers never installed.
Hall line gear and towers not available.
Taking offers
Lift is being dismantled in April 2025
Eastern USA
March 2025

This Ad has been viewed 60 times.